Daftar isi :
PELATIHAN DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS
TRAINING TENTANG DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS
INTRODUCTION PELATIHAN DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS:
Permit to work are used to control high risk work activities, such as hot work, work at height, confined spaces work etc. Method statements are used in many industries, again as a control measure to detail the correct and safe sequence for work operation.
OBJECTIVES PELATIHAN DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS:
The purpose of this training is to help in determining if a job requires a work permit due to ESS&H hazards, system complexities, or work coordination needs. If the job already has an established work procedure or has been reviewed and defined as “Worker Planned” work due to the training and qualifications of the crafts person or technician, then the checklist is not needed.
WHO SHOULD ATTEND THIS TRAINING?:
Anyone who uses or issues permits to work and anyone who produces or used method statements.
OUTLINE DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS:
1. Overview of safe systems of work
1. Human Engineering
2. Machine and Tools guarding
3. Behavioral factors
2. The purpose of permits and method statements
1. ESS&H or Other Permits Needed
2. Safety, Security and Facility Concerns
3. Environmental/Waste Concerns
4. Radiation Issues
5. Complexity/Uncertainty Issues
6. Work Coordination
3. Permit to work systems
4. Use of the documents in practice
5. Document templates will be provided to all delegates during the course.
Instruktur Training
Instruktur yang mengajar pelatihan Developing Permit To Work Systems ini adalah instruktur yang berkompeten di bidang Developing Permit To Work Systems baik dari kalangan akademisi maupun praktisi.
Jadwal Pelatihan Transform-mpi.com 2025 :
- Batch 1 : 30 – 31 Januari 2025
- Batch 2 : 13 – 14 Februari 2025
- Batch 3 : 11 – 12 Maret 2025
- Batch 4 : 16 – 17 April 2025
- Batch 5 : 15 – 16 Mei 2025
- Batch 6 : 25 – 26 Juni 2025
- Batch 7 : 16 – 17 Juli 2025
- Batch 8 : 6 – 7 Agustus 2025
- Batch 9 : 3 – 4 September 2025
- Batch 10 : 8 – 9 Oktober 2025 || 29 – 30 Oktober 2025
- Batch 11 : 13 – 14 November 2025 || 25 – 27 November 2025
- Batch 12 : 15 – 16 Desember 2025
Catatan : Jadwal dapat menyesuaikan dengan kebutuhan anda.
Biaya dan Lokasi Pelatihan :
- Jakarta :
- Bandung
- Yogyakarta
- Surabaya
- Malang
- Bali
- Lombok
Catatan : Biaya diatas belum termasuk akomodasi/penginapan. Apabila ada pertayaan mengenai materi, biaya, lokasi, jadwal dan penawaran lainnya, hubungi kami di nomor CS kami.
Fasilitas Pelatihan di transform-mpi.com:
- Penjemputan dari Hotel/Bandara/Stasiun/Terminal.
- Training Kit (Dokumentasi photo, Blocknote, ATK, Flashdisk, dll).
- Transportasi Peserta ke tempat pelatihan.
- 2x Coffe Break & 1 Lunch (Makan Siang).
- Training Room Full AC and Multimedia.
- Free Bag or Bagpackers (Tas Training).
- Softfile Foto Training
- Sertifikat Pelatihan.
- Souvenir Exclusive.












