PELATIHAN AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS
DESKRIPSI PELATIHAN AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS
1. Power Plant–Fossil fuels
+ Fossil fueled fired generating stations have very precise definition of Thermal efficiency.
+ It is the ratio of heat equivalent of Fuel fired to the heat equivalent of electricity sent to transmission net work.
+ Auxiliary power consumption has two components.
+ Unit auxiliary power consumption & station auxiliary power consumption.
2. Power plant cycle efficiency
+ Role of Steam Generator is to generate steam which is used to convert heat energy into kinetic energy.
+ Conversion cost includes usage of steam produced for internal consumption such as SCAPH ,TDBFP, Air Condtioning based on VAS
+ power consumption would depend on coal quality and on type of cycle.
+ Why not use better coal, which would lower auxiliary power consumption and an optimum performance can be sustained with less expenditure on O&M Cost.
3. Power plant cycle efficiency
+ Gross boiler efficiency at any point of operation can be improved by consuming more electricity through Mills & fans.
+ When we are using low cost–inferior coals- we consume more auxiliary power consumption to improve operating efficiency.
+ Usage of an additional pulverizer to handle poor coal results in increased power consumption, however, corresponding improvement in Gross boiler efficiency may not be achieved.
4. Importance of Auxiliary Power Consumption
+ Degradation of equipment performance can be readily guaged from power consumption .
+ Unit or boiler power consumption is monitored as % of generation which is just a gross index.
+ Power consumption guarantee on boiler covers all major drives
+ Power consumption should be measured together in a typical boiler efficiency test.
5. Change in plant Conditions with time increases Auxiliary power
+ Air in leakage to boiler gas enclosure
+ Fouling of Boiler heating Surface–higher dry gas loss would increase power consumption
+ Higher draft loss due to air ingress and ash deposition.
+ Air heater leakage/ Air ingress after APH’s
+ Deterioration of Turbine Steam Path Condition.
+ Condenser pressure/ condenser cleanliness- air ingress and extent of tube pluggage
+ Steam and water leaks from drains and vents.
6. Net Heat Rate
+ Net heat rate monitoring would cover impact of aux. Power consumption of different drive
+ Net heat rate monitoring can be adopted for inernal processess.
+ This would call for individual monitoring of drives using accurate energy meters .
+ Such a system is being introduced as a retrofit in all old plants in ntpc & consumption levels are being tracked from overhaul to overhaul.
7. Major Drives
+ Drives are listed for a typical 500 mw unit.
+ Auxiliary power consumption measurement can be done as per a standard test code.
+ However no test code covers correction methodology which would be worked out based on process design.
8. Performance Analysis
+ Measured total power could be different from base line values for changes in operating regime
+ It shall be higher wherever boiler performance has degraded
+ Gross power could be same because some auxiliaries may be doing better and some operating at worse point due to performance degradation
9. Correction Methodology
+ Correction methodology is jointly developed with vendor as it is not generally covered in test codes
+ Application of correction requires accurate monitoring of process parametes using accurate off line instruments
+ Coal variation would have major effect on unit performance and thus power consumption
10. Boiler Feed Pump
+ Boiler feed pump is not a boiler
+ Auxiliary and its power consumption varies in response to turbine mode of working and its degradation
11. Boiler Feed Pump
+ Bfp power consumption constitute a major chunk of power consumed by unit auxiliaries.
+ Usage of steam driven feed pump results in reduction of apc %.
+ Usage of turbo driven feedpump improves cycle efficiency.
+ Any feedback on tdbfp performance due to condenser degradation
TRAINING METHOD
* Presentation
* Discussion
* Case Study
* Evaluation
INSTRUKTUR PELATIHAN AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS:
Tugino and team
Jadwal Pelatihan Transform-mpi.com 2024 :
- Batch 1 : 03 – 04 Januari 2024 | 16 – 17 Januari 2024
- Batch 2 : 07 – 08 Februari 2024 | 20 – 21 Februari 2024
- Batch 3 : 05 – 06 Maret 2024 | 19 – 20 Maret 2024
- Batch 4 : 09 – 10 April 2024 | 13 – 24 April 2024
- Batch 5 : 07 – 08 Mei 2024 | 22 – 23 Mei 2024
- Batch 6 : 05 – 06 Juni 2024 | 25 – 29 Juni 2024
- Batch 7 : 09 – 10 Juli 2024 | 23 – 24 Juli 2024
- Batch 8 : 06 – 07 Agustus 2024 | 20 – 21 Agustus 2024
- Batch 9 : 04 – 05 September 2024 | 18 – 19 September 2024
- Batch 10 : 18 – 19 Oktober 2024 | 15 – 16 Oktober 2024
- Batch 11 : 06 – 07 November 2024 | 26 – 27 November 2024
- Batch 12 : 04 – 05 Desember 2024 | 18 – 19 Desember 2024
Catatan : Jadwal dapat menyesuaikan dengan kebutuhan anda.
Biaya dan Lokasi Pelatihan :
- Jakarta :
- Bandung
- Yogyakarta
- Surabaya
- Malang
- Bali
- Lombok
Catatan : Biaya diatas belum termasuk akomodasi/penginapan. Apabila ada pertayaan mengenai materi, biaya, lokasi, jadwal dan penawaran lainnya, hubungi kami di nomor CS kami.
Fasilitas Pelatihan di transform-mpi.com:
- Penjemputan dari Hotel/Bandara/Stasiun/Terminal.
- Training Kit (Dokumentasi photo, Blocknote, ATK, Flashdisk, dll).
- Transportasi Peserta ke tempat pelatihan.
- 2x Coffe Break & 1 Lunch (Makan Siang).
- Training Room Full AC and Multimedia.
- Free Bag or Bagpackers (Tas Training).
- Softfile Foto Training
- Sertifikat Pelatihan.
- Souvenir Exclusive.